jump to navigation

Construction Tuesday 1/16 December 14, 2007

Posted by jeanne in construction news, Urban Development.
add a comment

ednesday 6/7

the piles of wood on all the floors are disappearing slowly as men take off one plank at a time. they left the mini dozer and its trailer on guy’s yard. it rained last night, but not much, just soft, tho there was ice and snow behind it. we’re waiting for that this evening as it gets colder. maybe we’ll have an ice storm, that’d be cool – we have kerosene heaters.

the plumber came to fix our leak. they found it immediately, right in front of the meter, and then they discovered the meter was leaking and called it in to the city who were supposed to be out in 24 hours. they dug up our whole front yard, and put in copper pipe, also rigged a new shutoff valve and didn’t charge us for it. good old mitch cary and daughters.

Construction week 36, Monday 1/15 December 8, 2007

Posted by jeanne in construction news, Gardening, Urban Development.
add a comment

they were in pulling up all the plastic they’d put down in the middle part. they spanned the 2-story column with red steel, completing the east-west back of the building. the deck still has to extend out to the alley. they’ve built rebar cages that run horizontally over the entrance to the lower parking deck, the two columns we saw earliier are empty forms holding up the cages. they’ll build forms around these and pour real soon now. i saw them sloshing thru the water the burst hose had poured out into the central part all day yesterday. we’d left a message on forman’s cellphone but maybe he already knew about it, he never called us back to tell us where the stopcock was. they’ve mostly put up the floorbeams of the second residential floor extension. there’s a load of 2x4s out front. real wood. signals a completely different stage of construction.
waiting for it to rain, it’s in alabama, crossing from southwest to northeast, as usual. i’ve got the gravel dam cleared away (i had raked all the gravel off the wildflower bed to be and piled in a dam across the normal flow of the water. i think i want to do that with the trolley rails in the middle part of the yard, where it’s mostly flat. now the next time it rains, thewater will carve its own channel down the steep part, the 3rd quarter of the yard, where i had the dam. and when it’s marked out its channel, i’ll line it with higher ground and put some gravel into it, and seed the rest. if the gravel holds out. joke.
they started lifting stacks of lumber up to the new 1st residential floor extension and and 4th residential floor that’s been finished. the ones on the 1st floor are sitting out for the rain to fall on. at dusk a pickup came towing a little mini bulldozer. they unloaded it, then looked over our property, the ditch, the drainage, and discussed it, couldn’t tell what they said. then a dumptruck came up, and the bulldozer took a load of that dirt and put it in the truck. they left after dark, i wonder if they left the mini dozer.