jump to navigation

Construction Friday 7/21 September 30, 2006

Posted by jeanne in construction news, Urban Development.
trackback

ednesday 6/7 Out front, they’ve got to deal with the sewer connections coming out into the street from everybody’s house. Not now. They’ave got maps of the sewer system as it was put in around 1887, a year before the house was built. But all the neighbors have their sewer lines running out the back, down to the alley. The sewer is 8′ below the street out front. The lines are below that down the back. So how are they going to deal with this? Gravity is working against the system. We don’t know. The sewer engineers met Forman and talked with him yesterday.

The house shakes. It woke me out of a nap. Small vibrtations caused by I don’t know what, and big ones caused by the bulldozer pounding the hole in the street.

Advertisements

Comments»

No comments yet — be the first.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: