jump to navigation

Construction Friday 9/15 January 10, 2007

Posted by jeanne in construction news, Urban Development.
trackback

3' diameter cement sewer pipeOut there early, the mexicans talking. the windows mostly closed becase it’s cool in the mornings now, i thought they were in front because i could hear them better tru that window, which still has a fan in it and so is still open

two flatbeds with 3′ diameter pipe pulled up. for the alley. they unloaded it and left it lying around in the top of the alley.

Advertisements

Comments»

No comments yet — be the first.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: