jump to navigation

Construction Saturday 10/14 March 30, 2007

Posted by jeanne in construction news, Urban Development.
trackback

putting up the second floor with thin vertical beams

forman is here, don’t know what they’re doing. there are red iron i-beams on the ground in front of the crane, and someone delivered a flatbed full of something. it’s the 2nd floor with wooden railings, then cement columns and then red i-beams and then steel columns going up, a fraction of the size. and taller. there’s flags up on the ramp to mark the line between nextor and us, but they haven’t designated the back line, and the dirt hill comes too close to my tree for them to leave it that way. i requested this from the arborist, but as usual he was more interested in the other things going on.

took all day to warm up, but it’s quite pleasant now. started out at 54 this morning.

 

Advertisements

Comments»

No comments yet — be the first.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: