Construction Tuesday 10/24 April 5, 2007
Posted by jeanne in construction news, Urban Development.trackback
lifting planks to the 3rd floor with the crane. forman told husband that the steel uprights are two floor lengths, so there’s only going to be one more on top of it, which will make the height manageable. it’s only just as high as our rooftops now, at 2 stories. some earthmover cleared out the dirt from around our tree to the property line, but left the dirt piled up further down where i don’t care. the little bulldozer smoothed dirt around guy’s and maggie’s (not). the ditches and pipes they were talking about don’t look like what they described and showed us. they showed us the pipes, but not what the hole would look like, and it’s quite intrusive on both nextor’s and maggie’s land, but not of course on guy’s.
Comments»
No comments yet — be the first.